New rules to legitimize samostroev prolong





13.10.2010 09:38
Property News | New rules to legitimize samostroev prolong Ministry of Regional Development and Construction of Ukraine intends to extend until 2012 the period for acceptance in the operation of apartment houses built without a permit for construction works. Told the head of the State Architectural and Construction Inspection of Ukraine (Gosarhstroyinspektsiya) Alexander Bondarenko. "Until 2012, will operate this new order ... and we will overcome this unauthorized construction," said Bondarenko at a briefing in Kiev on Tuesday, commenting on the new procedure for taking into service samostroev designed to replace the interim, which expires December 31, 2010 year.

Bondarenko said that the new procedure will apply to all residential homes built without a permit for construction works. "In the new procedure we have canceled categorization, and this will be a uniform procedure for all homes with a status of" unauthorized construction ", - he said.

According to the head Gosarhstroyinspektsii to enter illegally constructed houses is necessary to conduct its examination for compliance with building safety, compliance with state building codes, and coordinate with local architect.

"Now this order is being coordinated. I believe, throughout the month, we agree on this order and it will be registered in the Ministry of Justice "- he added.

According to Bondarenko, according to the existing order is already legalized putting 24 thousand homes, representing more than 1.5 million square meters. m

As reported, the Government of Ukraine Decree № 1035 of September 9, 2009 approved a temporary order of adoption in the operation of private residential estate type, built without a permit for construction work.

Under this procedure, all private farmsteads, built without permits in the period from August 5, 1992 to January 1, 2008, may be taken into operation Gosarhstroyinspektsii authorities on the basis of a declaration from an individual who built the facility before December 31, 2010.

In this case, the statement of acceptance into service buildings with a total area of 200 square meters. m and a maximum altitude of up to two floors, as well as farm buildings area not exceeding 100 square meters. m must attach a certificate of harmonization taking into operation, issued by the local executive authorities, as well as the registration certificate at home, issued by BTI.

For adoption in the operation of homes with a total area of 350 square meters. m with an area of farm buildings not exceeding 150 square meters. m to the application and above documents should be attached document confirming the ownership or use of land, on which the house, as well as a report on the technical inspection for compliance with state standards and building codes.

For the houses with floor space over 350 square meters. m inspection replaced by a technical survey of the building.

Certificate of conformity of the building state building regulations issued by natural persons, after providing all the necessary documents to the authorities Gosarhstroyinspektsii, and after paying a fine for unauthorized construction, and for issuing the certificate.
Interfax
Content tags: Legislation
Did you like the material?Subscribe to our newsletter
Your comments:
Your opinion be first
 
 
Sign